toll free 1-855-542-2725

Regional Research

"The downtown transit terminal was constructed in 1974, and was initially designed for smaller buses serving fewer transit trips than the system carries today. The terminal in its current configuration is not suited to today’s operating environment.

The Downtown Transit Hub Plan will review and evaluate candidate sites for the hub along with concept plans and identify the most suitable location and design for a downtown terminal. "

Click here to read full document

"In the following analysis, major operating costs scaled to a representative advanced manufacturing plant are presented for a series of 24 regions in the U.S. and Canada. Findings are summarized in Exhibit I and show total annual operating costs ranging from a high of $42.5 million in the San Jose/Silicon Valley Region of California to a low of $ 27.5 million in the Eastern Ontario Region of Canada."

Click here to read full document

"In the following analysis, major operating costs scaled to a representative 250- worker distribution warehouse are presented for a series of 20 regional locations in the U.S and Canada. Annual operating cost totals are ranked in summary Exhibit 1 and range from a high of $21.3 million in the Meadowlands/Northern New Jersey Region to a low of $13.3 million in the Eastern Ontario Region of Canada."

Click here to read the full document